First Floor Completed
The deck for the first floor is complete and Jim has started to throw up walls. He started with the outside of the chimney. Jan and I spent the evening reviewing the wall layouts and made some minor changes in the mud room area after seeing how the layout works. We eliminated (for now) two doors in the mud room. The one nearest the outside door was completely eliminated forming a nook adjacent to the outside door. The door between the mud room and the hallway was changed to a 30" cased opening. We also decided to add a 36" cased opening at the entrance to the family room.
Jim will be back tomorrow to work on walls.
Jim will be back tomorrow to work on walls.