March 21st


The 440 pound tub was lifted up by Wayne the Crane and thrown in through the window.
Met with Bill Power last night to review bulkheads and transitions between the kitchen and the hallway.
Lakewood is coming back tomorrow to finish the roughins?
0 Comments:
Post a Comment
<< Home